Pyramid building
A work-in-progress simulation of pyramid building.
Current state: the heavy-stone candidate is animated through a proposed landing, with selected force, travel and material checks. A quarry-to-first-course opening is visible. Full construction, complete rigging and temporary structures remain unfinished.
Jump straight to the action

A descent pays for a lift
See the counterweight raise a 70-tonne stone, with an exterior-slope alternative.

48,384 people, combined force
Explore the oversized crew layout, then zoom in to see people and their rope lanes.

Turn the stone into a beam
Watch independently controlled end ropes turn the test stone.

Cross the chamber
Two proposed timber sledges carry the beam between fixed rope sets.

Set it onto the walls
Lower the beam and transfer its weight to selected permanent bearings.

Begin at the quarry
Follow one persistent block and individual spoil parcels toward the first course.
Know what you are looking at
Observed architecture gives the setting. The paper supplies a construction hypothesis. Project additions fill gaps explicitly. Each mechanism has sources, assumptions, conditional checks and open questions. Translucent equipment keeps unfinished details visible.
Starting paper: Scheuring’s proposed Great Pyramid construction process. The 70-tonne test solid, receiving arrangement and 48,384-person allocation are project additions. The resource tests human capability and the proposed process. Its assumptions and open details remain visible.